Aspect Estate, Officer

Location Shaws Road, Officer
Schedule July 2015 – December 2015

Project Detail

  • Stage 10: Installation of 750m x 100mm pipe for drinking water, 750m x 100mm
    pipe for recycled water, 40m x 125mm PE pipe for drinking water, 39m x 125mm
    PE Pipe for recycled water, 162m x 150mm PVC for drinking water and 162m x
    150 PVC for recycled water.
  • Stage 11: Installation of 700m x 100mm pipe for drinking water, 696m x 100mm
    pipe for recycled water, 90m x 150mm PVC for drinking water and 94m x 150mm
    PVC recycled water
  • Stage 12: Installation of 698m x100mm PVC drinking water, 697m of 100mm
    recycled water, 75m of 125mm poly drinking water and 74m of 125mm poly
    recycled water

Highlights/Challenges

  • Assisted the client with managing the project
  • Worked effectively with Comdain infrastructure to deliver project within
    timeframe.
  • Worked in with other contractors such as Simon brother Constructions to ensure
    efficient management and timely completion of programming requirements
  • Working parallel with major road

Overall Performance

  • Project delivered on time and within budget
  • Safety – No injuries or incidents recorded on the project
  • IR – no lost days due to industrial action